In this process, a circular gap is excavated up into the depth at which the soil will stand unsupported (about 0.5m for gentle clay and 2m for rigid clay). Vertical boards often called laggings, are then established in situation across the excavated face and so are held tightly versus the https://audiobooksbyjohngrisham11099.myparisblog.com/31236258/not-known-facts-about-drilled-pile-foundations-bd