1

The smart Trick of Hydrographic Survey in Dhaka That No One is Discussing

News Discuss 
In both situation, the depths measured needed to be examine manually and recorded, as did the placement of each and every measurement regarding mapped reference details as determined by a few-stage sextant fixes. The procedure was labor-intense and time-consuming and, Despite the fact that each specific depth measurement may be https://hydrographic-survey81098.blog2news.com/33041631/new-step-by-step-map-for-hydrographic-survey-in-bangladesh

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story